Section 7D.7C - 2021 (May & June)

MW2047 Restoration Progress (May)

 

 

 

0-6-0ST MW2047 Warwickshire

 

LH Steps given a second coat of

black gloss paint @ SVR Bewdley

on Sunday 2nd May 2021.

 

(photo:   David Cooke)

 

 

 

0-6-0ST MW2047 Warwickshire

 

Rear Inside RH frame given a second

coat of black gloss paint @ SVR Bewdley

on Sunday 2nd May 2021.

 

(photo:   David Cooke)

 

 

 

0-6-0ST MW2047 Warwickshire

 

Rear Inside LH frame given a second

coat of black gloss paint @ SVR Bewdley

on Sunday 2nd May 2021.

 

(photo:   David Cooke)

 

 

 

 

 

 

 

 

0-6-0ST MW2047 Warwickshire

 

RH Steps given a second coat of

black gloss paint @ SVR Bewdley

on Sunday 2nd May 2021.

 

(photo:   David Cooke)

 

 

0-6-0ST MW2047 Warwickshire

 

RH rear outside frame after a second

coat of black gloss paint @ SVR Bewdley

on Sunday 2nd May 2021.

 

(photo:   David Cooke)

 

 

0-6-0ST MW2047 Warwickshire

 

LH rear outside frame after a second

coat of black gloss paint @ SVR Bewdley

on Sunday 2nd May 2021.

 

(photo:   David Cooke)

 

 

0-6-0ST MW2047 Warwickshire

 

Brake gear shaft after a second coat

of black gloss paint @ SVR Bewdley

on Sunday 2nd May 2021.

 

(photo:   David Cooke)

 

 

 

 

 

 

0-6-0ST MW2047 Warwickshire

 

Rear LH outside frame and steps after

a second coat of black gloss paint @ SVR

Bewdley on Sunday 2nd May 2021.

 

(photo:   David Cooke)

 

 

0-6-0ST MW2047 Warwickshire

 

Brake gear shaft after a second coat

of black gloss paint @ SVR Bewdley

on Sunday 2nd May 2021.

 

(photo:   David Cooke)

 

 

 

 

 

 

 

 

0-6-0ST MW2047 Warwickshire

 

Rear LH Inside frame after a second

coat of black & red gloss paint @ SVR

Bewdley on Sunday 2nd May 2021.

 

(photo:   David Cooke)

 

 

 

 

 

 

 

 

0-6-0ST MW2047 Warwickshire

 

Rear RH Inside frame sfter a second

coat of black & red gloss paint @ SVR

Bewdley on Sunday 2nd May 2021.

 

(photo:   David Cooke)

 

 

 

 

 

 

 

 

0-6-0ST MW2047 Warwickshire

 

Rear RH Inside frame and trailing axlebox

after red gloss paint had been applied @

SVR Bewdley on Sunday 2nd May 2021.

 

(photo:   David Cooke)

 

 

 

 

 

 

 

 

0-6-0ST MW2047 Warwickshire

 

Rear LH Inside frame and trailing axlebox

after red gloss paint had been applied @

SVR Bewdley on Sunday 2nd May 2021.

 

(photo:   David Cooke)

 

 

0-6-0ST MW2047 Warwickshire

 

View of inside frames looking

forward from rear @ SVR Bewdley

on Sunday 2nd May 2021.

 

(photo:   David Cooke)

 

 

 

0-6-0ST MW2047 Warwickshire

 

Rear view of loco inside its

new home @ SVR Bewdley

on Sunday 2nd May 2021.

 

(photo:   David Cooke)

 

 

0-6-0ST MW2047 Warwickshire

 

Rear view of loco inside its

new home @ SVR Bewdley

on Sunday 2nd May 2021.

 

(photo:   David Cooke)

 

 

 

 

 

 

 

 

0-6-0ST MW2047 Warwickshire

 

New front buffer beam (under cover)

moved adjacent to locomotive @ SVR

Bewdley on Sunday 2nd May 2021.

 

(photo:   David Cooke)

 

 

 

 

 

 

 

 

 

0-6-0ST MW2047 Warwickshire

 

New front buffer beam moved

adjacent to loco @ SVR Bewdley

on Sunday 2nd May 2021.2.5.21.

 

(photo:   David Cooke)

 

 

 

0-6-0ST MW2047 Warwickshire

 

New rear buffer beam (under cover)

moved adjacent to locomotive @ SVR

Bewdley on Sunday 2nd May 2021.

 

(photo:   David Cooke)

 

 

0-6-0ST MW2047 Warwickshire

 

New rear buffer beam moved

adjacent to loco @ SVR Bewdley

on Sunday 2nd May 2021.

 

(photo:   David Cooke)

 

 

 

0-6-0ST MW2047 Warwickshire

 

Rear view of locomotive with new

buffer beam moved adjacent @ SVR

Bewdley on Sunday 2nd May 2021.

 

(photo:   David Cooke)

 

 

 

0-6-0ST MW2047 Warwickshire

 

'A' Frame following assembly but

prior to being elevated @ SVR Bewdley

on Sunday 16th May 2021.

 

(photo:   David Cooke)

 

0-6-0ST MW2047 Warwickshire

 

New rear bufferbeam after being

painted with red oxide primer (on the

previous weekend) @ SVR Bewdley

on Sunday 16th May 2021.

 

(photo:   David Cooke)

 

 

 

 

0-6-0ST MW2047 Warwickshire

 

New light duty work bench under cover

@ SVR Bewdley on Sunday 16th May 2021.

 

(photo:   David Cooke)

 

 

 

0-6-0ST MW2047 Warwickshire

 

Temporary shelter removed @ SVR

Bewdley on Sunday 16th May 2021.

 

(photo:   David Cooke)

 

 

 

0-6-0ST MW2047 Warwickshire

 

Temporary shelter removed @ SVR

Bewdley on Sunday 16th May 2021.

 

(photo:   David Cooke)

 

 

0-6-0ST MW2047 Warwickshire

 

Saddletank, Smokebox, old boiler

& chassis @ SVR Bewdley on

Sunday 16th May 2021.

 

(photo:   David Cooke)

 

 

 

0-6-0ST MW2047 Warwickshire

 

New 'A' frame in position over

rear end of chassis @ SVR Bewdley

on Sunday 16th May 2021.

 

(photo:   David Cooke)

 

 

0-6-0ST MW2047 Warwickshire

 

New rear bufferbeam after being

turned over but prior to being

cleaned & painted @ SVR Bewdley

on Sunday 16th May 2021.

 

(photo:   David Cooke)

 

 

 

0-6-0ST MW2047 Warwickshire

 

New front bufferbeam after being

turned over but prior to receiving

a second coat of red oxide @ SVR

Bewdley on Sunday 16th May 2021.

 

(photo:   David Cooke)

 

 

 

 

0-6-0ST MW2047 Warwickshire

 

Entrance to new WILT working

area @ SVR Bewdley on

Sunday 16th May 2021.

 

(photo:   David Cooke)

 

 

 

0-6-0ST MW2047 Warwickshire

 

WILT working area (formerly occupied

by 4150 Trust) @ SVR Bewdley

on Sunday 16th May 2021.

 

(photo:   David Cooke)

 

 

 

0-6-0ST MW2047 Warwickshire

 

New front bufferbeam after a second

coat of red oxide primer @ SVR Bewdley

on Sunday 16th May 2021.

 

(photo:   David Cooke)

 

 

 

0-6-0ST MW2047 Warwickshire

 

New rear bufferbeam being cleaned

prior to painting with red oxide primer @

SVR Bewdley on Sunday 16th May 2021.

 

(photo:   David Cooke)

 

 

0-6-0ST MW2047 Warwickshire

 

New rear bufferbeam after being cleaned

prior to painting with red oxide primer @

SVR Bewdley on Sunday 16th May 2021.

 

(photo:   David Cooke)

 

 

0-6-0ST MW2047 Warwickshire

 

New rear bufferbeam after receiving

a coat of red oxide primer paint @ SVR

Bewdley on Sunday 16th May 2021.

 

(photo:   David Cooke)

 

 

 

0-6-0ST MW2047 Warwickshire

 

New 'A' frame now mounted on channel

sections to allow for easy movement @ SVR

Bewdley on Sunday 16th May 2021.

 

(photo:   David Cooke)

 

 

 

0-6-0ST MW2047 Warwickshire

 

New front bufferbeam under cover

after being painted with red oxide

@ SVR Bewdley on Sunday 16th May 2021.

 

(photo:   David Cooke)

 

 

 

0-6-0ST MW2047 Warwickshire

 

Old bufferbeam after removal of

buffers @ SVR Bewdley on

Sunday 16th May 2021.

 

(photo:   David Cooke)

 

 

 

 

0-6-0ST MW2047 Warwickshire

 

Rear Buffers following removal

from old Bufferbeam @ SVR

Bewdley on Sunday 16th May 2021.

 

(photo:   David Cooke)

 

 

 

 

0-6-0ST MW2047 Warwickshire

 

Cabsides & Firebox cladding support hoops

during painting with red oxide primer @

SVR Bewdley on Sunday 16th May 2021.

 

(photo:   David Cooke)

 

 

 

0-6-0ST MW2047 Warwickshire

 

LH driving wheels in the process

of being cleaned @ SVR Bewdley

on Sunday 16th May 2021.

 

(photo:   David Cooke)

 

 

 

 

0-6-0ST MW2047 Warwickshire

 

Saddletank, Boiler & Frames basking

in the sunshine @ SVR Bewdley

on Sunday 30th May 2021.

 

(photo:   David Cooke)

 

 

 

0-6-0ST MW2047 Warwickshire

 

Rear buffer monting faves given a

coat of red oxide after cleaning @ SVR

Bewdley on Sunday 30th May 2021

 

(photo:   David Cooke)

 

 

 

0-6-0ST MW2047 Warwickshire

 

Rear bufferbeam ready to be

removed @ SVR Bewdley on

Sunday 30th May 2021.

 

(photo:   David Cooke)

 

 

 

0-6-0ST MW2047 Warwickshire

 

Old & new rear bufferbeams following

removal of former @ SVR Bewdley

on Sunday 30th May 2021.

 

(photo:   David Cooke)

 

 

 

0-6-0ST MW2047 Warwickshire

 

RH rear cab window frame

following removal @ SVR Bewdley

on Sunday 30th May 2021.

 

(photo:   David Cooke)

 

 

0-6-0ST MW2047 Warwickshire

 

Robin Jones cleaning the mounting

brackets following removal of

rear bufferbeam @ SVR Bewdley

On Sunday 30th May 2021.

 

(photo:   David Cooke)

 

 

0-6-0ST MW2047 Warwickshire

 

Rear Bufferbeam Mounting Brackets

after being cleaned and painted with

red oxide primer @ SVR Bewdley

on Sunday 30th May 2021.

 

(photo:   David Cooke)

 

 

 

 

 

 

 

 

 

 

0-6-0ST MW2047 Warwickshire

 

Firebox cladding support hoops

after being given another coat of

red oxide primer @ SVR Bewdley

on Sunday 30th May 2021.

 

(photo:    David Cooke)

 

 

 

0-6-0ST MW2047 Warwickshire

 

LH cabside after being

given another coat

of red oxide @ SVR

Bewdley on Sunday

30th May 2021.

 

(photo:   David Cooke)

 

 

 

0-6-0ST MW2047 Warwickshire

 

Rear Bufferbeam mounting brackets

after being prepared for trial fitting

of new bufferbeam @ SVR Bewdley

on Sunday 30th May 2021.

 

(photo:   David Cooke)

 

 

0-6-0ST MW2047 Warwickshire

 

LH & RH rear cab window frames

following removal @ SVR Bewdley

on Sunday 30th 2021.

 

(photo:   David Cooke)

 

 

0-6-0ST MW2047 Warwickshire

 

Inside view of cab following

removable of rear window

frames @ SVR Bewdley on

Sunday 30th May 2021.

 

(photo:   David Cooke)

MW2047 Restoration Progress (June)

 

 

 

0-6-0ST MW2047 Warwickshire

 

New rear bufferbeam trial fitted

in position @ SVR Bewdley on

Sunday 13th June 2021.

 

(photo:   David Cooke)

 

 

 

0-6-0ST MW2047 Warwickshire

 

New rear bufferbeam trial fitted

in position @ SVR Bewdley on

Sunday 13th June 2021.

 

(photo:   David Cooke)

 

 

 

0-6-0ST MW2047 Warwickshire

 

Rear buffer dismantled for restoration @

SVR Bewdley on Sunday 13th June 2021.

 

(photo:   David Cooke)

 

 

 

0-6-0ST MW2047 Warwickshire

 

LH inside frame prior to cleaning @ SVR

Bewdley on Sunday 13th June 2021.

 

(photo:   David Cooke)

 

 

 

0-6-0ST MW2047 Warwickshire

 

View of cab taken from inside of frames @

SVR Bewdley on Sunday 13th June 2021.

 

(photo:   David Cooke)

 

 

 

0-6-0ST MW2047 Warwickshire

 

LH inside frame prior to cleaning @ SVR

Bewdley on Sunday 13th June 2021.

 

(photo:   David Cooke)

 

 

 

0-6-0ST MW2047 Warwickshire

 

LH inside frame after cleaning @ SVR

Bewdley on Sunday 13th June 2021.

 

(photo:   David Cooke)

 

 

 

0-6-0ST MW2047 Warwickshire

 

View of cranks & eccentrics after cleaning

@ SVR Bewdley on Sunday 13th June 2021.

 

(photo:   David Cooke)

 

 

 

0-6-0ST MW2047 Warwickshire

 

View of LH driving wheel spring after cleaning

@ SVR Bewdley on Sunday 13th June 2021.

 

(photo:   David Cooke)

 

 

 

0-6-0ST MW2047 Warwickshire

 

Andy Poole & Brian Hill drilling pilot

mounting holes in new rear bufferbeam @

SVR Bewdley on Sunday 13th June 2021.

 

(photo:   David Cooke)

 

 

 

0-6-0ST MW2047 Warwickshire

 

Andy poole & Brian Hill drilling pilot

mounting holes in new rear bufferbeam @

SVR Bewdley on Sunday 13th June 2021.

 

(photo:   David Cooke)

 

 

 

0-6-0ST MW2047 Warwickshire

 

View of RH inside frames after cleaning @

SVR Bewdley on Sunday 13th June 2021.

 

(photo:   David Cooke)

 

 

 

0-6-0ST MW2047 Warwickshire

 

View from front under cylinder block @

SVR Bewdley on Sunday 13th June 2021.

 

(photo:   David Cooke)

 

 

 

 

0-6-0ST MW2047 Warwickshire

 

View of LH Driving Wheels @ SVR

Bewdley on Sunday 13th June 2021.

 

(photo:   David Cooke)

 

 

0-6-0ST MW2047 Warwickshire

 

View of rear end with new bufferbeam

being prepared for drilling of mounting

holes after trial fitting @ SVR Bewdley

on Sunday 13th June 2021.

 

(photo:   David Cooke)

 

 

 

0-6-0ST MW2047 Warwickshire

 

Second trial fitting of new rear

bufferbeam @ SVR Bewdley

on Sunday 13th June 2021.

 

(photo:   David Cooke)

 

 

 

0-6-0ST MW2047 Warwickshire

 

Second trial fitting of new rear

bufferbeam @ SVR Bewdley

on Sunday 13th June 2021.

 

(photo:   David Cooke)

 

 

 

0-6-0ST MW2047 Warwickshire

 

Rear buffer stock after being cleaned

and painted with red oxide primer @ SVR

Bewdley on Sunday 13th June 2021.

 

(photo:   David Cooke)

 

 

 

 

0-6-0ST MW2047 Warwickshire

 

LH cabside after being painted

with black topcoat @ SVR Bewdley

on Sunday 13th June 2021.

 

(photo:   David Cooke)

 

 

 

 

0-6-0ST MW2047 Warwickshire

 

RH cabside after being painted

with black topcoat @ SVR Bewdley

on Sunday 13th June 2021.

 

(photo:   David Cooke)

 

 

 

0-6-0ST MW2047 Warwickshire

 

View of LH driving wheels & brakegear

@ SVR Bewdley on Sunday 13th 2021.

 

(photo:   David Cooke)

 

 

 

 

0-6-0ST MW2047 Warwickshire

 

Mounting holes being drilled in new rear

bufferbeam by Andy Poole & Brian Hill @

SVR Bewdley on Sunday 13th June 2021.

 

(photo:   David Cooke)

 

 

 

0-6-0ST MW2047 Warwickshire

 

New rear bufferbeam with angles attached

ready to be lifted into position @ SVR

Bewdley on Sunday 27th June 2021.

 

(photo:   David Cooke)

 

 

 

0-6-0ST MW2047 Warwickshire

 

New rear bufferbeam with angles

attached ready to be lifted into position

@ SVR Bewdley on Sunday 27th June 2021.

 

(photo:   David Cooke)

 

 

 

 

0-6-0ST MW2047 Warwickshire

 

New rear bufferbeam being lifted

into position @ SVR Bewdley

on Sunday 27th June 2021.

 

(photo:   David Cooke)

 

 

 

0-6-0ST MW2047 Warwickshire

 

New rear bufferbeam in position being

attached with temporary bolts @ SVR

Bewdley on Sunday 27th June 2021.

 

(photo:   David Cooke)

 

 

 

0-6-0ST MW2047 Warwickshire

 

Inside frame spacers after

cleaning @ SVR Bewdley on

Sunday 27th June 2021.

 

(photo:   David Cooke)

 

 

 

0-6-0ST MW2047 Warwickshire

 

Inside RH Frame & leading axlebox

after cleaning @ SVR Bewdley

on Sunday 27th June 2021.

 

(photo:   David Cooke)

 

 

 

 

0-6-0ST MW2047 Warwickshire

 

Inside LH frame after cleaning

@ SVR Bewdley on Sunday

27th June 2021.

 

(photo:   David Cooke)

 

 

 

0-6-0ST MW2047 Warwickshire

 

New rear bufferbeam fixed in place

with temporary bolts @ SVR Bewdley

on Sunday 27th June 2021.

 

(photo:   David Cooke)

 

 

 

 

 

 

 

 

0-6-0ST MW2047 Warwickshire

 

Rear Buffer after being dismantled

but prior to being re-rusted @ SVR

Bewdley on Sunday 27th June 2021.

 

(photo:   David Cooke)

 

 

 

 

 

 

 

 

0-6-0ST MW2047 Warwickshire

 

Rear buffer headstock after

being dismantled @ SVR Bewdley

on Sunday 27th June 2021.

 

(photo:   David Cooke)

 

 

 

 

0-6-0ST MW2047 Warwickshire

 

front bufferbeam with buffers being

given a coat of red oxide primer @ SVR

Bewdley on Sunday 27th June 2021.

 

(photo:   David Cooke)

 

 

 

0-6-0ST MW2047 Warwickshire

 

Rear buffer after being dismantled @

SVR Bewdley on Sunday 27th June 2021.

 

(photo:   David Cooke)

 

 

 

 

0-6-0ST MW2047 Warwickshire

 

New rear bufferbeam after getting

another coat of red oxide primer @  SVR

Bewdley on Sunday 27th June 2021.

 

(photo:   David Cooke)

 

 

 

0-6-0ST MW2047 Warwickshire

 

Old rear bufferbeam about to be

taken to the scrap bin @ SVR Bewdley

on Sunday 27th June 2021.

 

(photo:   David Cooke)

 

0-6-0ST MW2047 Warwickshire

 

Front bufferbeam with buffers and

drawhook having had another coat

of red oxide primer @ SVR Bewdley

on Sunday 27th June 2021.

 

(photo:   David Cooke)

 

 

 

0-6-0ST MW2047 Warwickshire

 

Robin Jones in appropriate PPE

cleaning rear buffers prior to painting

with red oxide primer @ SVR Bewdley

on Sunday 27th June 2021.

 

(photo:   David Cooke)

 

 

 

0-6-0ST MW2047 Warwickshire

 

Rear buffer after cleaning but prior to

painting with red oxide primer @ SVR

Bewdley on Sunday 27th June 2021.

 

(photo:   David Cooke)

 

 

 

0-6-0ST MW2047 Warwickshire

 

New rear bufferbeam given a coat

of red oxide primer @ SVR Bewdley

on Sunday 27th June 2021.

 

(photo:   David Cooke)